BANIAS, 2006 - 2008

Owner: BANIAS Refinery Co.

Main Contractor: Technoexport, Czech Republic

Project Description:

Mechanical works:

- Dismantling of old heater 102 pipes 123 ton (Alloy steel P9) & installing the new ones.

- Remove the lining of heaters & gunning the new one.

- Replace 9 burners & air ducts.

- Replace condensers 102-S4A/B (2 pcs 56t each).

- Install of 2 new steam air preheaters.

- Install of 2 new heat exchangers & new piping.

- Install of 3 new steam generators.

- Install new air coolers.

- Install many vessels & pumps.

- Replace the trays & nozzles (stainless steel) in vacuum distillation column 72t.

- Replace piping 190 ton with the necessary modification.

- Painting &Insulation.

- NDT & Hydro test.

 Electrical works:

- Add new conduits for electrical installation.

- Electrical wiring.

- Lighting fixture installation.

- Cabling & termination.

- Operating panels.

Instrumentation works:

- Replace & add new electrical and pneumatic instrument.

- DCS system installation.

- Instrumentation tests.

Civil works:

- Constructing of buildings A5 &A4 air coolers.

- Foundation for the new exchangers & vessels.

- Foundation for pumps 22a,b.

- Trenching.

- Painting.

 